This project was one of many for the Ministry of Education, this was specifically a new build of 9 new classrooms and Poynter Electrical carried out the demo for exisitng electrical for the new infrastructure, we installed new lighting, electrical and communications. The entire project was about creating a low maintenance and environmentally friendly building which achieved an incredible 91% recycling rate and was a sustainable build. Poynter Electrical was also involved in the construction of a new pump room to upgrade the existing pool. This project was completed in 2021 during the challenging lockdowns but Poynter Electrical powered through and the whole project was completed well ahead of schedule despite the difficulties that the Covid-19 protocols brought.